STIGQter STIGQter: STIG Summary: Traditional Security Checklist Version: 1 Release: 3 Benchmark Date: 15 Jun 2020:

Environmental IA Controls - Training

DISA Rule

SV-41032r3_rule

Vulnerability Number

V-30988

Group Title

Environmental IA Controls - Training

Rule Version

EC-04.03.01

Severity

CAT III

CCI(s)

Weight

10

Fix Recommendation

1. All required personnel involved with Information Technology (IT) area/computer rooms must receive initial and periodic (minimum annually) environmental control training (specifically regarding humidity/temperature controls).

2. Training records must be updated to reflect this special training.

Check Contents

Check training records to ensure that all required personnel have received their initial and periodic (minimum annually) environmental control training (specifically humidity/temperature).

Ask personnel how they respond to an environmental alarm.

NOTES: This requirement should not be applied to a tactical environment, unless it is a fixed computer facility supporting missions in a Theater of Operations. The standards to be applied for applicability in a tactical environment are:

1) The facility containing the computer room has been in operation for more than one year.

2) The facility is "fixed facility" - a hard building made from normal construction materials - wood, steel, brick, stone, mortar, etc.

Vulnerability Number

V-30988

Documentable

False

Rule Version

EC-04.03.01

Severity Override Guidance

Check training records to ensure that all required personnel have received their initial and periodic (minimum annually) environmental control training (specifically humidity/temperature).

Ask personnel how they respond to an environmental alarm.

NOTES: This requirement should not be applied to a tactical environment, unless it is a fixed computer facility supporting missions in a Theater of Operations. The standards to be applied for applicability in a tactical environment are:

1) The facility containing the computer room has been in operation for more than one year.

2) The facility is "fixed facility" - a hard building made from normal construction materials - wood, steel, brick, stone, mortar, etc.

Check Content Reference

M

Target Key

2506

Comments